Minimum required installation space for each assembly

tubing
Sprinkler Assembly

Sprinkler assemblies are measured in feet by 1/2-foot increments from 1’ – 6’.  Minimum space is required over and above the length of the sprinkler assembly being installed. The dimensions for each of the corresponding retractable sprinkler assemblies are shown here. These dimensions are the minimum clearance space above the anechoic chamber required for each assembly.

Sizes listed represent both Vertical and Horizontal applications:

  • S.I.B. 1.0 assembly – 30 inches of clear space above the chamber installation is required.
  • S.I.B. 1.5 assembly – 36 inches of clear space above the chamber installation is required.
  • S.I.B. 2.0 assembly – 42 inches of clear space above the chamber installation is required.
  • S.I.B. 2.5 assembly – 48 inches of clear space above the chamber installation is required.
  • S.I.B. 3.0 assembly – 54 inches of clear space above the chamber installation is required.
  • S.I.B. 3.5 assembly – 60 inches of clear space above the chamber installation is required.
  • S.I.B. 4.0 assembly – 66 inches of clear space above the chamber installation is required.
  • S.I.B. 4.5 assembly – 72 inches of clear space above the chamber installation is required.
  • S.I.B. 5.0 assembly – 78 inches of clear space above the chamber installation is required.
  • S.I.B. 5.5 assembly – 84 inches of clear space above the chamber installation is required.
  • S.I.B. 6.0 assembly – 90 inches of clear space above the chamber installation is required.

Designed to work with single interlocking Pre-Action Systems

Patent # RE40,562

Sprinkler Innovations
Sprinkler Innovations

We Also Offer Custom Design, Installation & Maintenance

We provide a range of services for retractable fire sprinkler assemblies, including design, installation, maintenance, and testing.